Project


KEY PROJECT REFERENCE

A. Pharmaceutical Plant (HVAC and Control-System)

1. PT Bayer Indonesia Tbk.

From 1998, till now, we are still serving for HVAC and Controls work, including partial improvement for positive Room Pressure in the Production area. Controls is using DDC (Direct Digital Control) with portable terminal, installed in the year 2000-2001. The job is reguraly maintained as servicecontract.

 

Sample of AHU schematic modification for Variable Air Volume System
Chiller Installation (water-cooled type)

 

2. PT Novartis Biochemie

In 2001 when they renovated CPP plant. The project name is CPP

Plant extension project where we do comprehensive work. The

HVAC is to achieve Temperature, RH and Positive Presure. Until

now, we are still serving for maintenance work.

 

3. PT Darya Varia Laboratoria Tbk.

We started partial renovation in 2002  for soft capsule production area, for Positive

Pressure Project. The works covers installation of new AHUs, chilled water pipingworks and control system works.

Other works included AC for Packaging, Finish Goods, Storage, Lab Mikro, etc.

Then, Continue with comprehensive HVAC and controls for GP Production area which is still carried out until present. The works include new air-cooled chiller c/w installation, new AHUs installation and controls system.

The entire HVAC are being hooked-up with PC based controls system. There will be no CAV AHU after the renovation/improvement work.

 

B. General VAC

1. AC installation for Elnusa Building Executive Lounge, 1998.

2. Wisma Mulia VAC work (8 storey work of 50 storey office building), in 2003.

3. Chiller repair and service work at PT Dankos Laboratories, in 2001.

4. AC Installation in PT Pertiwi Agung, Cibitung (split duct and split wall).

5. AC installation for BT Bayer Material Science in Anyer, Cilegon also for PT Bayer Cibubur and Cimanggis.

6. Split Ducts up to 20 PK size and small Split wall Supply and Installation for PT Pertiwi Agung, Cibitung.

7. Small split duct and AC installation.

 

Controls (BAS) Work

1. Elnusa Building, a 18-storey Building Automation system.

Elnusa Building 1997-1998 DDC Panel Lay-out

The system monitor and control the operation of VAC and lighting for the building.

2. Bursa Efek Jakarta, Building Automation System, 1997-1998.

3. PT Schering Indonesia, Building Auatomation and Fire Detection System Istallation work, a sub-contract work, 1998-1999.

4. PT Pfizer, a sub-contract for Local Controls work for HVAC,1999.

5. PT Bayer Indonesia Tbk, a DDC system with Portable terminal interface for production HVAC, 2000-2001.

6. Building Automation work for Y2K at Graha Surya Internusa, 20-storey office tower, PT BEJ, and ELNUSA, in 1999-2000.

7. PT (Persero) PELINDO II, a Fire Detection System upgrade work (8-storey) building, in 2002, and 2003.

8. RS Dharmais Jakarta for Fire Detection and Building Automation work, in 2000-2001.

9. HVAC&BAS for PT Darya Varia Laboratoria Tbk. 2003-2004.

10. HVAC&BAS for PT Novartis Biochemie (Sandoz) 2001.

11. HVA&BAS for PT Ades Waters Indonesia (Nestle Grup).

12. PT ACTAVIS INDONESIA, HVAC, BAS incl. VAV SYSTEM (2006).

13. PT MEDIAFARMA LAB, HVA&BAS SYSTEM (2007).

14. PT DARYA VARIA, HVAC& ADD EXISTING BAS (2007).

15. PANEL MIMIC for HOTEL MANHATTAN JKT.

16. PT SANDOZ INDONESIA, ALL HVAC, BAS and MEP works

17. PT COCA COLA BANDUNG, HVAC and VENTILLATION for PET FILLING in BANDUNG

18. PT PHAPROS, SAMPLING ROOM HVAC

19. PT COCA COLA BOTTLING INDONESIA, CIBITUNG PLANT, PANDAAN PLANT

20. PT PRATAPA NIRMALA (FAHRENHEIT)

 

C. Mechanical and Plumbing Works

1. PT SANDOZ Indonesia ,

Ventillation System as part of HVAC work, Domestic Water System, Compressed Air System, Steam Pipe works and Distribution, Fire Fighting work, Nitrogen Pipework, Hot Water System Work.

2. PT Medifarma Lab,

Hot Water Pipework for Reheat including Heat Recovery System as part of Complete HVAC work.

3. PT Bayer Indonesia,

Steam and Hot Water Pipework as part of HVAC work.

 

D. ELECTRICAL WORK

1. In most of our Project we do ourselves by our own electrical team for supporting the HVAC team.

2. PT Darya Varia Lab….. Supply and Install Power Panel for Chiller 300TR, AHUs, as well as modification of existing AHU starter panels

3. PT CocaCola Bandung and Cibitung …… Supply and Install Chiller Power Panel, AHU/ Fan Power Panel

4. PT Medifarma Lab, ………. Supply and Install PLN Incoming 1000KVA include Transformer, LVMDP, MDP , Feeder Cable and Distribution to AHU Panel, Lighting Panel.

5. PT SANDOZ Indonesia, …….. Install Transformer, Supply and Install new LVMDP, MCCs, Power Panel for HVAC, Feeder Cable Work, Distribution Cable Work, Lighting work as well as Electronic Work (Fire Detection System ex Honeywell, BAS work, Telephone and Data Cabling Work include Testing & Commissioning).

6. PT Bayer Indonesia, .……. AHU Power Panel Modification (reassemble existing power panel), BAS Work, Fire Detection Work, Modification of Chiller/Pumps Panel to include Variable Speed Systems for Pumps (Chilled Water and Hot Water System).

 

Has been in Control and HVAC industy since 1990, many key controls-project done with intensive HVAC related for stringent requirements. Name some projects, such as The Regent Hotel Jakarta, Glaxo Pharmaceutical, MNI Twin Tower in KL, Gateway Building in S’pore, Manggala Wanabakti Complex, and any other buildings.

Related course : HVAC and controls in S’pore (Honeywell S’pore), 1990,1992.

Air-conditioning course in M’sia, 1993 Dealer Course for Reliable Controls (in Canada) in

2004.

 

Member : ASHRAE OTHER DOCUMENTS ARE AVAILABLE UPON REQUEST